Home›Deployment

Installation

Deployment

AI-ELEX mounts on a DIN rail inside the existing distribution panel, or connects through a separate measurement enclosure. No equipment replacement or large-scale construction is needed. You can start at the points you need and expand step by step.

How to install

Three things that keep installation simple

01

Compact enough for a tight distribution panel

We designed it small so it fits in the space inside an existing distribution panel. It can be used even at sites where space is short.

02

A retrofit that connects to your existing panel

It mounts inside the panel on a DIN rail, or, where there is no spare space, connects through a separate measurement enclosure. No power equipment is replaced and no structure is changed.

03

Start with what you need, expand step by step

You do not need to build out every circuit from the start. Install at the highest-priority points first, then add measurement points.

System Diagram

System diagram

AI-ELEX, installed in the distribution panel, measures power through sensors and sends the data over wired LAN. Managers check it on a PC or a smartphone.

Distribution panel Main · by floor · by equipment
AI-ELEX + sensors Measures voltage · current · temperature · earth leakage
Site network Switching hub · router Wired LAN connection
PC · smartphone Web monitoring system

※ For sites with no wired LAN near the distribution panel, we offer an optional compact router that connects Wi-Fi to LAN. Sites with no network at all can connect through an optional LTE module (at additional cost), and several units can share a single router. Wireless communication uses commercial modules certified in the country of supply.

Process

Deployment process

From the site survey to day-to-day operation, we work through five steps.

  1. STEP 01

    Site survey

    We check the panel layout, what is to be measured and the operating goal.

  2. STEP 02

    Set measurement points

    We decide where Core and Hub go and how many are needed.

  3. STEP 03

    Install and map

    We install the devices and register panel, equipment and zone information.

  4. STEP 04

    Pattern learning

    We analyze normal use patterns and the periods with peak risk.

  5. STEP 05

    Ongoing optimization

    We improve operations through alerts, guidance and reports.

Examples

Setup examples by site

Site typeSetupKey focus
Small factoryCore, 1 to 3 unitsMain power, anomaly detection on key equipment
Factory built around key equipmentCore per item of equipmentUse compared by equipment, failure prediction
Small to mid-size buildingCore at the main panel + Hub at key panelsCommon-area waste, peak management
Large buildingCore at the main panel + Hub per floor + Hub per zoneBilling by floor and zone, equipment management
Facility management companyIntegrated monitoring across several buildingsComparison between buildings, call-out priority

Before we talk

Having this ready before we talk
makes the review faster

If you can tell us the following, we can advise more accurately on the setup that fits your site and the expected cost. Rough figures are fine.

Site type

Factory, building, retail facility, school, hospital and so on

Main goal

Lower electricity bills, equipment anomaly detection, electrical safety, automated reports

Monitoring scope

Main only, common areas only, by floor, by zone, number of items of equipment

Photo of the panel

A photo that shows the internal space and the circuit layout

How could it be installed
at your site?

Send us a photo of the distribution panel and your management scope, and we will review first whether installation is possible.

Request a consultation See the FAQ

Tel. +82-70-7574-5106 (Weekdays 10:00 – 18:00)